Case Studies

Example Drain Installation Project:

A recent installation of a WPL DMS2 Sewage treatment plant with 110m pumped outlet,
Works included

  • Excavating and connecting to existing foul drainage pipes
  • Excavating for a new tank 
  • Connecting to electric supply 
  • Installing a new STP
  • Excavating a new 110m outfall trench for pumped outlet 
  • Re profiling a 40m ditch run
  • Fitting a pre-cast headwall in ditch 
  • Reinstating the menage area
  • Fitting a pre cast headwall in ditch
  • Reinstating the menage area

24/7 Emergency Call Out

For drainage emergencies, contact us on 01206 385438