Case Studies
Example Drain Installation Project:
A recent installation of a WPL DMS2 Sewage treatment plant with 110m pumped outlet,
Works included
- Excavating and connecting to existing foul drainage pipes
- Excavating for a new tank
- Connecting to electric supply
- Installing a new STP
- Excavating a new 110m outfall trench for pumped outlet
- Re profiling a 40m ditch run
- Fitting a pre-cast headwall in ditch
- Reinstating the menage area
- Fitting a pre cast headwall in ditch
- Reinstating the menage area





24/7 Emergency Call Out
For drainage emergencies, contact us on 01206 385438