Skip to main content

Call Anytime

01206 385 438

Sewage Treatment Plant Tank Installations

We are registered installers of various types of Sewage treatment plants. Offering the most suitable tanks for the works.

We work closely with WCS Environmental Engineering who supply us with ideal off mains sewage solutions.

Our most popular STP installed is:

WCS discreet Diamond (formerly known as WPL Diamond).

This treatment plant is better designed for modern day living than a septic tank system, with faster process and a more environmentally friendly result.  There is no need for chemicals, allowing final effluent to be safely discharged to a drainage field or watercourse. Unlike the traditional septic tanks, the modern packaged wastewater (sewage) treatment plants such as a Diamond are designed with an aerated process for todays’ increased volume of water usage in everyday life.

Homeowners with septic tanks that discharge directly into the surface water will now need to consider the option of replacing with a packaged wastewater treatment plant, when selling a property or upgrading an ‘end of life’ septic tank.

How it works:

Site Assessment: Conduct soil tests to understand its permeability, strength, and suitability for construction. Assess groundwater levels and flow patterns to ensure the STP will not interfere with local water sources. Evaluate the distance from residential areas, water bodies, and existing infrastructure to minimize environmental impact.

Design and Planning, type of Treatment System based on the volume and type of wastewater. Capacity Planning to determine the design flow rate (in cubic meters per day) based on population equivalent (PE) or industrial discharge.

Obtaining Permits/Approvals: Some regions require a comprehensive EIA to assess the potential environmental effects of the STP. To submit design plans and operation strategies to local environmental authorities for approval.

Once the above has been established and a quote have been approved, we’d make a start on preparation for site.

  • Remove vegetation, rocks, and other obstructions.
  • Use of machinery to dig the required trenches and pits according to the design specifications.
  • Use durable materials, such as reinforced concrete, to construct tanks and other structures to prevent corrosion and ensure longevity.
  • Install pumps, blowers, and other mechanical systems according to the specifications.
  • Use appropriate materials for gravity flow and pressure systems.
  • Ensure that all electrical installations comply with local codes, including safety standards for water and wastewater systems.
  • Check for leaks in the system by filling the tanks with water and monitoring for any loss.
  • Run the system under controlled conditions to ensure that all components function as intended. Gradually introduce wastewater into the system while monitoring its performance.
  • Schedule regular inspections of mechanical equipment, structures, and treatment processes.

By following these steps and considerations, you can ensure that the installation of the sewage treatment plant is successful and compliant with all regulations.
We are committed to providing you with the assurance you need to complete the works to your satisfaction.

Please feel free to contact us for a quote. We look forward to assisting you.

Have Any Question In Your Mind?

Give Us a Call Today! 01206 385 438

let's work together

Get In Touch With Us


    ACD Services (UK) LTD
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.